Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Jul 18, 2022     Match drilling doubler fork - (1.0 hour)       Category: Wings
In this session, I started by flattening the bend out of the doubler fork that will be used on the inboard edge of the rear spar. This part comes from the factory with a slight bend due to the punching process during manufacturing. Then I clecoed it into place on the rear spar and match drilled all of the couple dozen rivet holes in it. Then I mounted the rear spar on top of the ribs on the rest of the wing assembly with clecos, to prepare for the next steps.

What's next? There's some more match drilling I have to do, then some priming prep.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.